SPECIALISED DESIGN

in sanitary and mechanical sector

COMBINED ENERGY MANAGEMENT

innovation, novelty, professionalism

FROM CONCEPTION
THROUGHT DESIGN
TO IMPLEMENTATION

We offer comprehensive services.

About company

T

he design office FRAM Sp. z o. o. Sp. k.  was formed in response to the growing needs of the market in terms of design and supervision of specialised investments in the sanitary and mechanical engineering.

We specialise in modern technological systems using condensing technology, heat pumps, cogeneration, solar systems and combined production of heat and cold.

The owners of the company and at the same time the main designers are Ireneusz Kordusiak and Jakub Banaszak, graduates of Poznan University of Technology Department of Civil and Environmental Engineering.

Designers have building license no. WKP/0137/POOS/04 and WKP/0132/POOS/04 Membership in the Chamber of Civil Engineers no. WKP/IS/0504/05 and WKP/IS/0505/05. We have required engineer insurance, additional extended engineer insurance and insurance for designers who prepare energy certificates.

Currently, the project team consists of engineers, masters of Poznan University of Technology, Department of Civil and Environmental Engineering.

We continuously train and improve our qualifications in order to do the commissioned tasks in the best possible way.

Our computer lab is equipped with modern AutoCAD software and necessary specialist devices for printing and edition of docummentation.

The recipients of our services are architects, contractors, private investors and industrial plants.

We invite you to contact us and use our services!

We cooperate with

We take the challenge regardless of the scale and level of difficulty of the project

What do we do?

We offer designs from the wide range of mechanical installations:

SANITARY AND TECHNOLOGICAL SEWAGE INSTALLATIONS

Read more
  • projects of domestic sewage installations through underfloor systems,
  • designs of outside installations and sewage networks equipped with wells and sewage treatment plants,
  • sewage pumping station projects, projects of fat separation systems,
  • sanitary sewer connections.

WATER FIRE SYSTEM INSTALLATIONS

Read more
  • water balances for fire systems,
  • projects of water installations for outdoor fire purposes equipped with fire hydrants and places to connect the fire brigade vehicles,
  • projects of indoor hydrant fire systems,
  • projects of indoor fire systems with splinkler heads, pumping stations and reservoirs,
  • performed in PN standards and VdS CEA.

HEATING INSTALLATIONS

Read more
  • calculating the heat balance for rooms and buildings; choice of optimal heating system,
  • calculation of the annual energy consumption,
  • determination of the operating costs for energy and fuel,
  • central heating system projects with convector radiators and heating channels,
  • projects of water low parameter underfloor and wall heating installations for households and industrial buildings,
  • designs of technological heat water installations for ventilation heaters,
  • projects of water radiant installations for industrial faciliies,
  • designs of air heating systems using air heater units, heaters and central ventilation units.

COOLING AND AIR CONDITIONING INSTALLATIONS

Read more
  • calculating the demand for cold, choice of the optimal cooling system, selection of necessary devices for cooling and air conditioning systems,
  • cooling installation designs using iced water, ammonia and freon,
  • fan coil installations working on low parameter iced water (wet cooling),
  • chilled beam installations working on iced water, which is high parametered what prevents condesation (dry cooling),
  • the surface cooling installations, collecting sensible heat profits from the room,
  • selection of antifreeze substances,
  • freon installations designs using split and multisplit devices,
  • freon installation designs in VRV systems covering whole building,
  • cooling installations using water heat pumps, with particular usage in shopping centers.

INTEGRATED HEATING AND COOLING SYSTEMS FOR BUILDINGS

Read more
  • projects of integrated cooling and heating systems, which use for both needs same installations and devices working seasonally on different parametres; it can significantly reduce the cost of the investment,
  • projects of integrated cooling and heating systems, with simultaneous production of heat and cold, which can significantly reduce operating costs,
  • projects of systems producing cold with heat recovery systems for e.g. heating hot water.

MECHANICAL VENTILATION SYSTEMS

Read more
  • projects of mechanical ventilation systems with ventilation central units and rooftops, using heat recovery through rotary, cross or tubular heat exchangers,
  • designs of ventilation plants and ventilation systems adapted to the function and purpose of the building – ventilation for living and sanitation, comfort ventilation, local exhaust at the emitters of pollutants.

COMPRESSED AIR INSTALLATIONS

Read more
  • designs of compressed air installations with compression, dehumidification and filtration systems,
  • Calculating the air balance for technological purposes.

GAS INSTALLATIONS

Read more
  • projects of gas network and internal installations for the gas supply of the gas receivers such as boilers, stoves, technological equipment,
  • gas reduction points, gas measuring systems.

WASTE HEAT MANAGEMENT

Read more
  • projects of heat recovery from waste water and washings, using the heat from gases, using energy from machine cooling systems, heat recovery from the subcooled liquid refrigerant in compressor – condensing systems.

INTEGRATED PRODUCTION SYSTEMS OF ELECTRICITY, HEAT AND COLD

Read more
  • designs of systems that produce electricity while producing heat – cogeneration or trigeneration with additional production of cold,
  • economic analysis of different solutions, calculating the return of the investment and possible savings.

STORM WATER SEWAGE INSTALLATION

Read more
  • roof drainage projects in the traditional and vacuum technology with heated inlets,
  • projects of storm water drainage from the whole investment through sewage network equipped with wells and street intakes,
  • projects of waste water treatment plants for wastes from streets and parking lots – oil separation systems, sand separation systems,
  • balances and analysis of ways of storm water management depending on local technical conditions,
  • retention systems, pumping stations, flow regulators, leach and evaporation tanks.

COLD AND HOT WATER INSTALLATIONS

Read more
  • projects of water supply connections with objects, balances of the water demand, water measuring systems,
  • internal installation’s projects for cold water, hot water and circulation for sanitary facilities and technology,
  • designs of hot water heating systems using both traditional systems and renewable energy sources like heat pumps or solar systems,
  • projects of water treatment plants for each level of the desired water quality.

HEAT SOURCES TECHNOLOGY

Read more
  • design of thermal stations supplied by local heating plants,
  • boilers using all types of fuel: gas, oil, coal, wood; condensing boilers,
  • boilers depending on the heated medium – low and high parameter water, steam, thermal oil,
  • projects of warehouses and oil stations for designed boiler houses,
  • projects of the heating centers integrated with devices using renewable energy sources; boiler houses where boilers cooperate with heat pumps or solar systems – are often an alternative to find a balance between capital and operational costs.

SYSTEMS BASED ON RENEWABLE ENERGY SOURCES

Read more
  • projects of heating and cooling installations, using the energy from: ground, water, air and sun,
  • heat pumps projects with heat sources in the form of vertical drilling or horizontal coil,
  • supporting of the boiler houses with air heat pumps to reduce energy usage and operating costs,
  • projects of using cold stored in the ground during summer to supply heat pumps, which work in active and passive mode,
  • designs of air underground heat exchangers to minimalize energy inputs for cooling and heating the ventilation air,
  • designs of solar systems used for heating water,
  • projects of heating and cooling systems using gas heat pumps powered by waste heat sources.

COLD SOURCES TECHNOLOGY

Read more
  • designs of cooling plants equipped with freon compressor or ammonia chillers,
  • cooling plants technology based on both integrated systems and systems with separate condensers and chillers cooled with liquid,
  • projects of cooling towers closed and spray-evaporative, and systems using exchangers for iced water and technological water,
  • designs of process water preparation stations for cooling purposes.

STEAM INSTALLATIONS

Read more
  • steam boiler houses installations for heating and technological purposes,
  • steam and condensate return systems,
  • designs of water – steam heating stations,
  • steam reduction station projects,
  • designs of condensate preparation systems and thermal degassing,
  • projects of water treatment stations to get permeate.

ICED WATER AND MACHINE COOLING INSTALLATIONS

Read more
  • projects of colling systems for industrial purposes, including infrastructure, plants and cooling towers,
  • choice of optimal cooling systems.

We prepare docummentation for all stages of the construction process:

  • technical consultancy
  • multivariant concepts of design solutions
  • modernization concepts of existing systems
  • inventories
  • audits
  • media request balances
  • projects for the purpose of obtaining the building permitts
  • cost calculations
  • tender projects
  • environmental information cards
  • executive projects
  • energy certificates
  • opracowania powykonawcze,
  • post-completion docummentation
  • interbranch coordination

Our realizations:

2014
ZWC Millano Ltd.
Building: Production hall ZWC Millano in Wysogotów
Stadium: PB, PW
Description of the installation: sanitary installations (internal gas installation), technological installations (thermal oil installation)
Waterworks Kosciański Ltd.
Building: sewage treatment plant for Kościan
Stadium: OT
Description of the installation: technical opinion on the ventilation installation in the laboratory rooms
THULE Trailers Ltd.
Building: Production plant Thule Group in Wieleń
Stadium:PB
Description of the installation: Sanitary installations – internal gas installation
Żywiec Zdrój S.A. Cięcina
Building: Production plant Żywiec Zdrój in Mirosławiec
Stadium: PW
Description of the installation: Modernization of the heating installation – substation
Dairy Cooperative in Gostyń
Building: The office building in Dairy Cooperative in Gostyń
Stadium: PK
Description of the installation: The concept of air conditioning system in four variants
Wrocław Sewage Treatment Plant
Building: Cointainer drying room
Stadium: PB
Description of the installation: The concept of the inerting system of dry sediment storage tank.
Volkswagen Poznań Ltd.
Building: Paint shop in Volkswagen
Stadium: PW
Description of the installation: Installation of the mechanical ventilation
ZWC Millano Ltd.
Building: Production Hall ZWC Millano in Wysogotów
Stadium: PB, PW
Description of the installation: Sanitary installations – water-sewage, fats separation.
Dental Centre in Poznań
Obiekt: Pomieszczenia dydaktyczne Uniwersytetu Medycznego w Poznaniu Stadium: PW Opis instalacji: Instalacje sanitarne: wodno – kanalizacyjna, gazowa, chłodzenia. InstBuilding: Teaching rooms of the University of Medical Science in Poznań
Stadium: PW
Description of the installation: Sanitary installations – water-sewage, gas, cooling; medical gases installations. alacje gazów medycznych.
Fitness24
Building: Fitness24 in Dębiec Gallery in Poznań
Stadium: PW
Description of the installation: Sanitary installations – water-sewage, fire, heating-cooling and mechanical ventilation.
B-G Ltd.
Building: Production-storage building of B-G Ltds’.
Stadium: PW
Description of the installation: Sanitary installations – heating and mechanical ventilation.
ZWC Millano Ltd.
Building: Social-office building in Wysogotów
Stadium: PB
Description of the installation: Sanitary installations – water-sewage, heating, ventilation and cooling.
THULE Trailers Ltd.
Building: Production plant Thule Group in Wieleń
Stadium: PB
Description of the installation: Sanitary installations – internal heating and gas installation.
Volkswagen Poznań Ltd.
Building: VWP 1 Plant – reconstruction of the building
Stadium: PW
Description of the installation: Sanitary installations – water-sewage, heating-cooling, ventilation.
Volkswagen Poznań Ltd.
Building: Hall no 2 – Z2 VWP foundry
Stadium: PPW
Description of the installation: as-built docummentation of the mixture of hydrogen and nitrogen installation.
Volkswagen Poznań Ltd.
Building: Cooling tunnel in hall 1 plant 3 VWP
Stadium: PK, PB, PW
Description of the installation: Sanitary installations – ventilation; technological installations – cooling water and compressed air.
MORI SEIKI, FAMOT Pleszew S.A.
Building: Expansion of the production plant in Pleszew
Stadium: PB, PW
Description of the installation: Sanitary installations – fire, water-sewage internal and external, heating, ventilation and cooling; technological installations – compressed air.
ZWC Millano Ltd.
Building: Production hall ZWC Millano in Wysogotów
Stadium: PK
Description of the installation: fire installations.
Bridgestone Poznań Ltd.
Building: Air compressor
Stadium: PW
Description of the installation: Technological installations – steam and compressed air
Intermarche in Chojna
Building: the commercial-service object in Chojna
Stadium: PW, PB
Description of the installation: Sanitary installations – internal and external water-sewage, fire, heating, ventilation and cooling.
KiK shop
Building: KiK shop in Dębiec Gallery in Poznań
Stadium: PW
Description of the installation: Sanitary installations – water-sewage and mechanical ventilation.
Residence in Lusowo
Building: Family house; area: F=450m2
Stadium: PW
Description of the installation: Sanitary installations – gas, water-sewage, heating nd ventilation.
Biowatt S.A.
Building: Cointainer dryer
Stadium: PB
Description of the installation: Sanitary installations – heating installation; technological installations – the installation of digestate and compressed air.
Public Kindergarten House of the Pooh in Swarzędz
Stadium: PW
Description of the installation: Sanitary installations – water-sewage, heating and ventilation.
Retail Park Bolesławiec
Building: Shopping mall in Bolesławiec
Stadium: PK, PB
Description of the installation: Sanitary installations – water-sewage, sprinkler, ventilation, heating and cooling.
Intermarche in Lipno
Building: the commercial-service object Intermarche in Lipno
Stadium:PW, PB
Description of the installation: Sanitary installations – internal and external water-sewage, fire, heating, vetilation and cooling.
District Headquarter of the State Fire Service
Building: Rescue-fire extinguishing unit in Oborniki
Stadium: PW
Description of the installation: Sanitary installations – heating, cooling and ventilation.
NETTO in Kłodawa
Building: the commercial-service object Netto in Kłodawa
Stadium: PB
Description of the installation: Sanitary installations – internal and external water-sewage, fire, heating, ventilation and cooling.
Gas Station ITM in Poznań
Building: Gas Station ITM in Umultowska Street in Poznań
Stadium: PB
Description of the installation: Sanitary installations – water-sewage, heating and cooling.
Medical Clinic in Olsztyn
Building: Residential-commercial-service object with medical clinic in Olsztyn
Stadium: PB
Description of the installation: Sanitary installations – water-sewage, fire, heating, chilled water, ventilation; installation of medical gases.
Dębiec Gallery in Poznań
Building: Dębiec Gallery in Poznań
Stadium: OT
Description of the installation: Technical opinion and acceptance of projects implementation.
Office and residence in Kiszkowo
Building: Office and family house; area: F=750m2
Stadium: PW
Description of the installation: Sanitary installations – water-sewage, gas, heating with heat pump and ventilation.
2013
KDC “Pomorzanka “ Ltd.
Building: Food products warehouse with office-social building
Stadium: PB
Description of the installation: Sanitary installations.
Bridgestone Poznań Ltd.
Building: Air compressor for the soots passing through
Stadium: PK
Description of the installation: Compressed air installation’s modernization for the soots transportation in the compressor.
ZWC Millano Ltd.
Building: Warehouse building PROLONGIS in Sady
Stadium: PW
Description of the installation: Air cooling installations.
ZWC Millano Ltd.
Building: Production Hall, Ul. Olszynowa 15 Wysogotowo
Stadium: PW
Description of the installation: Mechanical ventilation and cooling installations.
Okéchamp Ltd.
Building: Mushroom factory, Borucino, Okonek
Stadium: PW
Description of the installation: Engine room technology of chilled water.
Volkswagen Poznań Sp. z o.o.
Building: Office rooms
Stadium: PB, PW
Description of the installation: Sanitary installations.
Water and Sewage Company Ltd. in Oborniki
Building: Swimming pool in Oborniki Wlkp.
Stage I:
Stadium: Inventory
Description of the installation: Heating and ventilation installations for the needs of the energy audit; energy audit

Stage II:
Stadium: PB, PW
Description of the installation: Modernization of the sanitary installations in the building and on the plot; Heating and ventilation installations, heat sources with cogeneration system and heat pumps, gas installation.

Stage III:
Stadium: PB, PW
Description of the installation: Extension of the swimming pool with new forms of recreation. Sanitary installations.

Palace in Śliwniki
Building: Restoration and adaptation of the Śliwniki palace along with the building of a swimming pool and garage
Stadium: PW
Description of the installation: Water-sewage installations.
Residence in Gortatów
Building: Family house, area: F=330m2
Stadium: PW
Description of the installation: Sanitary installations – water, underfloor heating and ventilation.
Primary School in Poznań
Building: Primary School, ul. Brzeska in Poznań
Stadium: PB, PW
Description of the installation: The energy performance, sanitary installations.
KGHM Polish Cooper S.A., branch Mining Plant “Rudna”
Building: Building ZAS, link building and headroom in the R VII shaft
Gazette No. 319/10, precinct Tarnówek
Stadium: PB
Description of the installation: Ventilation installation in the lamps washing facilities
Hempel Manufacturing (Poland) Ltd.
Building: Production plant Hempel in Niepruszew
Stadium: PB
Description of the installation: Internal gas installation for the needs of power of the technological afterburning device.
MORI SEIKI, FAMOT Pleszew S.A.
Building: Hardening house hall
Stadium: PW
Description of the installation: Adaptation of the hardening house hall building into the gringery hall; heating, cooling and mechanical ventilation installations.
Volkswagen Poznań Ltd.
Building: Hall no 2 Z3 VWP
Stadium: PB, PW
Description of the installation: Reconstruction of the existing production facilities into the Measurement Laboratory; sanitary installations.
MORI SEIKI, FAMOT Pleszew S.A.
Building: Office building – reconstruction
Stadium: PW
Description of the installation: Mechanical ventilation and cooling installations.
Ferrari car showroom in Poznań
C.H. Stare Koszary, ul. Wojskowa 4, 60-795 Poznań
Stadium: PB
Description of the installation: Sanitary installations.
JN-SERWIS Ltd. S.K.A.
Building: Complex of retail-service buildings in Skierniewice
Stadium: PB
Description of the installation: Storm water drainage installations.
District Headquarter of the State Fire Service
Building: District Headquarter of the State Fire Service
Stadium: PW
Description of the installation: Sanitary and storm water drainage installations.
PKN Orlen S.A.
Building: Gas station PKN Orlen no 4; Gazette no 461,462, section Zblewo 0016
Stadium: PW
Description of the installation: Petroleum technology.
Car paintshop Artur Sroka
Building: Car paintshop in Jasin
Stadium: PB
Description of the installation: Oil boiler house, heat source technology.
Dairy Cooperation
Building: Administrative building
Stadium: PK
Description of the installation: Air conditioning installation.
Thule Group Ltd.
Building: Production plant Thule Group
Stadium: PB
Description of the installation: Installations of the three oil boiler houses technology.
ZWC Millano Ltd.
Building: Production Hall
Ul. Olszynowa 15, Wysogotów
Stadium: PW
Description of the installation: Modernization of the mechanical ventilation installation.
Volkswagen Poznań Ltd.
Building: Hall no 5 Z1 VWP
Stadium: PK, PB, PW
Description of the installation: Separation of the offices – sanitary installations.
MORI SEIKI, FAMOT Pleszew S.A.
Building: Office building
Stadium: PW
Description of the installation: Installations of cooling and ventilation of the offices.
Bridgestone Poznań Ltd.
Building: Building of the soots passing through
Stadium: PW
Description of the installation: Compressed air installation.
Bricomarche in Inowrocław
Building: Expansion of the retail pavilon in Inowrocław
Stadium: PB
Description of the installation: External sanitary installations, storm water drainage, roof drainage, internal hydrants, heating-ventilation installations, internal gas installation.
Winter Garden in Tuczno
Building: Winter garden in residence in Tuczno
Stadium: PW
Description of the installation: Heating and ventilation installation.
2012
Boltex Sp. J. Jerzy Ewa Tomasz Bolewski
Building: Service-commercial building
Stadium: PB, PW
Description of the installation: Sanitary installations on the plot and the building.
Area: F=2400m2
KGHM Polish Cooper S.A., branch Mining Plant “Rudna”
Building: Building ZAS, link building and headroom in the R VII shaft
Gazette No. 319/10, precinct Tarnówek
Stadium: PB
Description of the installation: Reconstruction and development to adapt to the requirements of fire safety regulations.
Bridgestone Poznań Ltd.
Building: Building of the soots passing through Bridgestone Poznań Ltd.
Stadium: PW
Description of the installation: Technological installations; modernization of the compressed air installation for soot’s transportation.
Aquanet S.A.
Aquanet S.A.
Building: Thermal drying of the sediment station, facility no 94
Stadium: PB
Description of the installation: Technological installations; the construction of the air launcher from the sedimant’s dryer biofilter.
PKN Orlen S.A.
Building: Gas station PKN Orlen no 177; Gazette no 208,221, section Tczew 10
Stadium: PW
Description of the installation: Petroleum technology
Roman Catholic Parish, Our Lady of the Rosary
Building: Parish Church
Stadium: PB
Description of the installation: Gas installation, air heating installation.
RED Fitness Anna Machura
Building: Sports Zone Res Fitness Swarzędz
Stadium: PB
Description of the installation: Installation of the ventilation with cooling.
Aquanet S.A., Wastewater Treatment Plant
Building: Left-bank Wastewater Treatment Plant – bars hall
Stadium: PT
Description of the installation: Installation of the ventilation system modernization.
Intermarche, Hortensja Ltd.
Building: Food industry market located in the shopping mall
Stadium: PB
Description of the installation: Sanitary installations
PASO-DOBLE
Building: Warehouse hall with office-social building
Stadium: PB
Description of the installation: Sanitary installations.
KSH Invest Ltd.
Building: Service and shopping centre Galeria Krotoszyńska
Ul. Floriańska – Słodowa, 63-700 Krotoszyn
Stadium: PB, PW
Description of the installation: Sanitary installations
Palace in Śliwniki
Building: Restoration and adaptation of the palace in Śliwniki, together with the build of pool and garages
Stadium: PB, PW
Description of the installation: Gas installation, heat technology, ventilation system.
Palace in Targowa Górka
Building: Residential family building in Targowa Górka
Stadium: PW
Description of the installation: Sanitary installations
Area: F=2800m2

Our clients

Our passion is to reduce energy consumption and to protect the environment

OUR TEAM

  • Natalia Bobińska
    Natalia BobińskaProjektant
  • Joanna Ejsmont
    Joanna Ejsmontdesigner
  • Anna Lassa
    Anna Lassadesigner
  • Damian Pilarczyk
    Damian Pilarczykdesigner
  • Małgorzata Rzeszuto
    Małgorzata Rzeszutodesigner
  • Tomasz Kruczkowski
    Tomasz Kruczkowskidesigner
  • Justyna Dąbrowska
    Justyna DąbrowskaAssistant designer
    • Ewa Tabaka
      Ewa TabakaAssistant designer
      • Anna Jakubowska
        Anna JakubowskaAssistant designer
        COMPANY HEADQUATERS
        FRAM Spółka z ograniczoną odpowiedzialnością spółka komandytowa

        ul. Boczna 12
        64-000 Kościan
        NIP: 698-183-52-26

        DESIGN OFFICE

         ul. Piękna 28/2
        60-591 Poznań
        mobile +48 533 089 404

        We invite you to contact us

        Szybki kontakt

        Zapraszamy do kontaktu z nami

        Facebook